GOPLASTICPALLETS.COM LAUNCHES UK’S LIGHTEST EURO PLASTICPALLET TO BOOST EXPORT EFFICIENCY - August 19, 2026
-
QUECLINK PROVIDES FLEET AND ASSET TRACKING BOOST FOR THE FREIGHT AND LOGISTICS SECTOR - August 18, 2026
-
Shuttle technology and integration expertise: Jungheinrich and Movu Robotics agree strategic partnership - August 13, 2026
-
AUTHENTICITY SELLS: WHY GREAT INFLUENCER CAMPAIGNS DEPEND ON GREAT FULFILMENT - August 10, 2026
-
ROAD TRANSPORT OPERATORS TURNING TO TECHNOLOGY FOR ADVANCED PROTECTION AGAINST FUEL THEFT RISK - August 5, 2026
-
Endra opens in New York, San Francisco, and London to break the engineering bottleneck holding up construction - August 4, 2026
-
Freehand Raises $75M to Scale AI Teams Managing Supply Chain Spend for Fortune 500 Companies - July 29, 2026
-
RAM Tracking on course to become fleet solutions powerhouse after historic merger - July 27, 2026
-
Cascade raises $3.5M to help construction firms predict the future and win more projects - July 22, 2026
-
Raben Group digitalises European co-packing operations with Nulogy - July 22, 2026
Twintec – Superflat Flooring Specialists.
VNA racking requires a very flat floor to operate efficiently and safely. All too often warehouse floors are constructed and then require extensive grinding within the aisles to achieve the flatness tolerance specified.
Twintec will design and construct a DM1 floor slab to tolerance maintaining all the advantages of a large panel ‘jointless’ SFRC floor slab. Twintec’s competence was recently demonstrated at a new logistics facility in Qatar where the independent DM1 flatness survey reports an overall 99.4% compliance with the required specification, making it the flattest large panel ‘jointless’ floor slab in the GCC. The project has 18m high racking and floor panel sizes up to 32.6m x 32.5m. Twintec designed and constructed the floor slab utilising high tensile strength steel fibres, with no saw-cut joints and no remedial grinding required.
This would be impossible for general contractors even with ‘expert’ supervision and remains challenging for specialist flooring contractors, generally necessitating substantial remedial grinding within the aisles to meet the MHE operational standards.
Twintec’s Commercial Director, Tom Menary, said “There are key critical success factors to constructing a DM1 large panel ‘jointless’ floor slab. These include highly skilled and experienced workers on site, precision in-house developed machinery and robust quality control processes. The role of other parties on site is key also with a strictly controlled and prepared working environment for the floor slab construction and the correct concrete mix design, delivery and quality. Twintec takes total responsibility for the floor slab offering a clearly defined Design-Build-Guarantee service that removes any split responsibility”.
Twintec has a long-standing track record of designing and constructing high tolerance floor slabs worldwide, including a recent DM1 project in Oman.
With logistics technology rapidly evolving, and racking continuing to get higher, logistics operators will need to consider the demands that will be placed on the floor more closely and consider the benefits of working with a specialist flooring contractor to meet their flatness needs. www.twintecgroup.com